Congo (DR) - Port Banana Friday July 30-2010  






  


  
 
 Contacts
 Port Coordinator
Contact Name:
Address:


Tel:

E-mail:
Jean Claude Bomba
20 boulevard du 30 juin, Muanda ville, RDC

+243 81 904 03 024

jeanclaudebomba@yahoo.fr

 Clearing & Forwarding Manager
Contact Name:
Address:


Tel:

E-mail:
Jean Claude Bomba
20 boulevard du 30 juin, Muanda ville, RDC

+243 81 904 03 024

jeanclaudebomba@yahoo.fr
 Shipping Manager
Contact Name:
Address:


Tel:

E-mail:
Jean Claude Bomba
20 boulevard du 30 juin, Muanda ville, RDC

+243 81 904 03 024

jeanclaudebomba@yahoo.fr
 Base Facilities
 Supply Vessel Berth:
Name:
Latitude / Longitude:
Maximum Draft:
Maximum LOA:
Port de Banana
06° 00’ 4” South / 12° 24’ 1” East
18 FT High Tide
75 Meters

 General Port:
Maximum Draft:
Maximum LOA:
Any other restrictions:
18 FT
75 meters
Vessels up to 130 Meters may dock at Banana Port

 Stevedoring:
Port Cranes:

Other Load / Discharge Equipment:
2 x cranes of 4 Tons capacity at 5 meters

1 x mobile crane of 70 Tons capacity at 3 meters and 20 Tons capacity at 10 meters are available. (Owned by neighbouring oil operators)

 Storage:
Yard/Open Storage Facilities:
1 x yard – open space of 6000 Sq. meters

 Warehouse Facilities:
1 x roofed warehouse of 450 Sq. meters
 Support Facilities
 
» Customs Clearing
» Forwarding Facilities
» Airfreight
» Seafreight
» Cash to Master Service
» Office Services available
» Communication Services available
 Crew and Travel Services
 
» Airport Welcome Service
» Immigration Assistance
» Hotel Bookings
» Car Hire
» Travel Agency Services
» Medical and Evacuation Services
 Additional Services
 
» Muanda airport is located 11kms from the port
» Bunkering is possible in the port
» Freshwater is possible in the port
» There are facilities for waste management at the port
» There is one shipchandler available at the port.

Other information
» Due to a naval military base proximity, no night time operations are authorised at the port. However discharging – loading    operations may be done by supply boasts at anchorage position.

Weather Conditions
» While raining port stevedoring operations are suspended.

Print Page
Top of page     
Home | Afritramp Oilfield Network | Links | Contacts
© Afritramp Oilfield 2005